Title: HDPE Geomembrane CQA Plan
(Construction Quality Assurance)
 

This "CQA Plan" for HDPE geomembranes was originally prepared for those projects in which the project specifications were inadequate so therefore also includes project specifications. It will shortly be divided into separate project specifications and a CQA Plan. Note that the objective of CQA is to ensure that the liner is built according to the project specifications, with the best possible workmanship, and within the constraints of the budget and schedule. CQA does NOT ensure a perfect lining system. If the liner is poorly designed, CQA will ensure that that poorly designed liner is installed. CQA should contribute positively to the quality of the lining system, it should not be only a glorified data collection system. This CQA Plan is ready for immediate use. It just requires a few project specific details to be added. Text (that can be erased) provides some guidance on the project specific information required.

HDPE Geomembrane CQA (Construction Quality Assurance) Plan

Table of Contents

1. INTRODUCTION
2. DEFINITIONS RELATING TO CONSTRUCTION QUALITY ASSURANCE.
  2.1 Construction Quality Assurance and Construction Quality Control
  2.2 Use of the Terms in this Plan
3.PARTIES TO CONSTRUCTION QUALITY ASSURANCE
  3.1 Description of the Parties
    3.1.1 Owner
    3.1.2 Operator
    3.1.3 Project Manager
    3.1.4 Design Engineer (Engineer)
    3.1.5 General Contractor/Earthwork Contractor
    3.1.6 Resin Supplier
    3.1.7 Geomembrane Manufacturer (Manufacturer)
    3.1.8 Transporter
    3.1.9 Land Surveyor
    3.1.10 Geomembrane Installer (Installer)
    3.1.11 Construction Quality Assurance Consultant
    3.1.12 Construction Quality Assurance Laboratory
  3.2 Qualifications of the Parties
    3.2.1 Geomembrane Manufacturer
    3.2.2 Geomembrane Installer
    3.2.3 Transporter
    3.2.4 Construction Quality Assurance Consultant
    3.2.5 Construction Quality Assurance Laboratory
  3.3 Duties of Construction Quality Assurance Personnel
    3.3.1 CQA Manager
    3.3.2 CQA Site Superintendent0
4. COMMUNICATIONS
5. SCOPE OF CONSTRUCTION QUALITY ASSURANCE

6. UNITS
7. REFERENCES
8. PROJECT CONTROL: ACTIVITIES, SCHEDULE, AND PROBLEM SOLUTION
 

8.1 Project Coordination Meetings

  8.1.1 Resolution Meeting
8.1.2 Pre-Construction Meeting
8.1.3 Progress Meetings
8.1.4 Action Decision Meeting
  8.2 Project Control Visits
9. GEOMEMBRANE MANUFACTURING, TRANSPORTATION, AND STORAGE
  9.1 High Density Polyethylene Geomembrane Manufacturing
  9.1.1 Raw Material
  9.2 Geomembrane Plant Audit

9.2.1 Scope
9.2.2 Quality Control
9.2.3 Manufacturing Process
  9.3 Manufacturing
  9.3.1 Submittals
9.3.2 Rolls
9.3.3 Conformance Testing
  9.3.3.1 In-plant testing
9.3.3.2 On-site material testing
9.3.3.3 Properties of the HDPE Geomembrane
    9.3.4 Conformance Tests
    9.3.5 Test Procedures
    9.3.6 Sampling Procedures
    9.3.7 Test Results
    9.3.8 Procedures in the Case of a Conformance Test Failure
  9.4 Delivery
    9.4.1 Transportation and Handling
    9.4.2 Storage
10. GEOMEMBRANE INSTALLATION
  10.1 Earthwork
    10.1.1 Surface Preparation
    10.1.2 Anchorage System
  10.2 Geomembrane Placement
    10.2.1 Field Panel Identification
    10.2.2 Field Panel Placement
      10.2.2.1 Location
      10.2.2.2 Compensation for Material Expansion and Contraction, OR Intimate Subgrade Contact
      10.2.2.3 Installation Schedule
      10.2.2.4 Weather Conditions
      10.2.2.5 Method of Placement
      10.2.2.6 Damage
  10.3 Field Seaming
    10.3.1 Seam Layout
    10.3.2 Seaming Equipment and Products
      10.3.2.1 Fusion Seaming
      10.3.2.2 Extrusion Seaming
    10.3.3 Seam Preparation
    10.3.4 Weather Conditions for Seaming
    10.3.5 Overlapping and Temporary Bonding
    10.3.6 Trial Seams
    10.3.7 General Seaming Procedure
    10.3.8 Nondestructive Seam Continuity Testing
      10.3.8.1 Concept
      10.3.8.2 Submittals
      10.3.8.3 Vacuum Testing
      10.3.8.4 Air Pressure Testing
      10.3.8.5 Spark Testing
      10.3.8.6 Visual Examination
    10.3.9 Destructive Testing
      10.3.9.1 Concept
      10.3.9.2 Location and Frequency
      10.3.9.3 Sampling Procedure
      10.3.9.4 Size of Samples
      10.3.9.5 Field Testing
      10.3.9.6 Construction Quality Assurance Laboratory Testing
      10.3.9.7 Installer's Laboratory Testing
      10.3.9.8 Destructive Sample Pass/Fail Criteria
      10.3.9.9 Procedures if Destructive Sample Fails
  10.4 Defects and Repairs
    10.4.1 Identification
    10.4.2 Evaluation
    10.4.3 Repair Procedures
    10.4.4 Verification of Repairs
    10.4.5 Large Wrinkles
    10.4.6 Bridging of Geomembrane
    10.4.7 Geomembrane Anchoring
  10.5 Backfilling of Anchor Trench
  10.6 Appurtenances

11. SOILS IN CONTACT WITH GEOSYNTHETICS
12. RESPONSIBILITY FOR GEOMEMBRANE LINER
13. DOCUMENTATION
  13.1 Daily Record keeping
    13.1.1 Observation Logs and Testing Data Sheets
14. CQA FINAL REPORT
 

14.1 CQA Final Report Contents
 

14.2 Record Drawings
TABLES
  Table 1. HDPE GEOMEMBRANE SPECIFICATIONS - segment 9.3.3.3
  Table 2. AIR CHANNEL TEST PRESSURES FOR HDPE GEOMEMBRANES - segment 10.3.8.4
  Table 3. ALLOWABLE PRESSURE LOSS IN AIR CHANNEL TEST- segment 10.3.8.4
  Table 4. SPARK TESTING - segment 10.3.8.5
  Table 5. SEAM SPECIMEN TEST SPECIFICATIONS - segment 10.3.9.7
APPENDICES
  APPENDIX A - MANUFACTURER/INSTALLER COMPLIANCE AGREEMENT