| 1. INTRODUCTION |
| 2. DEFINITIONS RELATING TO CONSTRUCTION
QUALITY ASSURANCE. |
| |
2.1 Construction Quality Assurance and Construction Quality
Control |
| |
2.2 Use of the Terms in this Plan |
| 3.PARTIES TO CONSTRUCTION
QUALITY ASSURANCE |
| |
3.1 Description of the Parties |
| |
|
3.1.1 Owner |
| |
|
3.1.2 Operator |
| |
|
3.1.3 Project Manager |
| |
|
3.1.4 Design Engineer (Engineer) |
| |
|
3.1.5 General Contractor/Earthwork
Contractor |
| |
|
3.1.6 Resin Supplier |
| |
|
3.1.7 Geomembrane Manufacturer
(Manufacturer) |
| |
|
3.1.8 Transporter |
| |
|
3.1.9 Land Surveyor |
| |
|
3.1.10 Geomembrane Installer (Installer) |
| |
|
3.1.11 Construction Quality Assurance Consultant |
| |
|
3.1.12 Construction Quality Assurance Laboratory |
| |
3.2 Qualifications of the Parties |
| |
|
3.2.1 Geomembrane Manufacturer |
| |
|
3.2.2 Geomembrane Installer |
| |
|
3.2.3 Transporter |
| |
|
3.2.4 Construction Quality Assurance Consultant |
| |
|
3.2.5 Construction Quality Assurance Laboratory |
| |
3.3 Duties of Construction Quality
Assurance Personnel |
| |
|
3.3.1 CQA Manager |
| |
|
3.3.2 CQA Site Superintendent0 |
| 4. COMMUNICATIONS |
| 5. SCOPE
OF CONSTRUCTION QUALITY ASSURANCE |
|
6. UNITS |
| 7. REFERENCES
|
| 8. PROJECT
CONTROL: ACTIVITIES, SCHEDULE, AND PROBLEM SOLUTION |
| |
8.1 Project Coordination Meetings
|
| |
8.1.1 Resolution Meeting |
| 8.1.2 Pre-Construction Meeting |
| 8.1.3 Progress Meetings |
| 8.1.4 Action Decision Meeting |
| |
8.2 Project Control Visits |
| 9. GEOMEMBRANE
MANUFACTURING, TRANSPORTATION, AND STORAGE |
| |
9.1 High Density Polyethylene Geomembrane Manufacturing |
| |
9.1.1 Raw Material |
| |
9.2 Geomembrane Plant Audit |
|
|
9.2.1 Scope |
| 9.2.2 Quality Control |
| 9.2.3 Manufacturing Process |
| |
9.3 Manufacturing |
| |
9.3.1 Submittals |
| 9.3.2 Rolls |
| 9.3.3 Conformance Testing |
| |
9.3.3.1 In-plant testing |
| 9.3.3.2 On-site material testing |
| 9.3.3.3 Properties of the HDPE Geomembrane |
| |
|
9.3.4 Conformance Tests |
| |
|
9.3.5 Test Procedures |
| |
|
9.3.6 Sampling Procedures |
| |
|
9.3.7 Test Results |
| |
|
9.3.8 Procedures in the Case of a Conformance
Test Failure |
| |
9.4 Delivery |
| |
|
9.4.1 Transportation and Handling |
| |
|
9.4.2 Storage |
| 10. GEOMEMBRANE
INSTALLATION |
| |
10.1 Earthwork |
| |
|
10.1.1 Surface Preparation |
| |
|
10.1.2 Anchorage System |
| |
10.2 Geomembrane Placement |
| |
|
10.2.1 Field Panel Identification |
| |
|
10.2.2 Field Panel Placement |
| |
|
|
10.2.2.1 Location |
| |
|
|
10.2.2.2 Compensation for Material Expansion and Contraction,
OR Intimate Subgrade Contact |
| |
|
|
10.2.2.3 Installation Schedule |
| |
|
|
10.2.2.4 Weather Conditions |
| |
|
|
10.2.2.5 Method of Placement |
| |
|
|
10.2.2.6 Damage |
| |
10.3 Field Seaming |
| |
|
10.3.1 Seam Layout |
| |
|
10.3.2 Seaming Equipment and Products |
| |
|
|
10.3.2.1 Fusion Seaming |
| |
|
|
10.3.2.2 Extrusion Seaming |
| |
|
10.3.3 Seam Preparation |
| |
|
10.3.4 Weather Conditions for Seaming |
| |
|
10.3.5 Overlapping and Temporary Bonding |
| |
|
10.3.6 Trial Seams |
| |
|
10.3.7 General Seaming Procedure |
| |
|
10.3.8 Nondestructive Seam Continuity Testing |
| |
|
|
10.3.8.1 Concept |
| |
|
|
10.3.8.2 Submittals |
| |
|
|
10.3.8.3 Vacuum Testing |
| |
|
|
10.3.8.4 Air Pressure Testing |
| |
|
|
10.3.8.5 Spark Testing |
| |
|
|
10.3.8.6 Visual Examination |
| |
|
10.3.9 Destructive Testing |
| |
|
|
10.3.9.1 Concept |
| |
|
|
10.3.9.2 Location and Frequency |
| |
|
|
10.3.9.3 Sampling Procedure |
| |
|
|
10.3.9.4 Size of Samples |
| |
|
|
10.3.9.5 Field Testing |
| |
|
|
10.3.9.6 Construction Quality Assurance Laboratory Testing |
| |
|
|
10.3.9.7 Installer's Laboratory Testing |
| |
|
|
10.3.9.8 Destructive Sample Pass/Fail Criteria |
| |
|
|
10.3.9.9 Procedures if Destructive Sample Fails |
| |
10.4 Defects and Repairs |
| |
|
10.4.1 Identification |
| |
|
10.4.2 Evaluation |
| |
|
10.4.3 Repair Procedures |
| |
|
10.4.4 Verification of Repairs |
| |
|
10.4.5 Large Wrinkles |
| |
|
10.4.6 Bridging of Geomembrane |
| |
|
10.4.7 Geomembrane Anchoring |
| |
10.5 Backfilling of Anchor Trench |
| |
10.6 Appurtenances |
|
11. SOILS IN CONTACT WITH GEOSYNTHETICS |
| 12. RESPONSIBILITY
FOR GEOMEMBRANE LINER |
| 13. DOCUMENTATION |
| |
13.1 Daily Record keeping |
| |
|
13.1.1 Observation Logs and Testing Data Sheets |
| 14. CQA
FINAL REPORT |
| |
14.1 CQA Final Report Contents |
| |
14.2 Record Drawings |
| TABLES |
| |
Table 1. HDPE GEOMEMBRANE SPECIFICATIONS
- segment 9.3.3.3 |
| |
Table 2. AIR CHANNEL TEST PRESSURES
FOR HDPE GEOMEMBRANES - segment 10.3.8.4 |
| |
Table 3. ALLOWABLE PRESSURE
LOSS IN AIR CHANNEL TEST- segment 10.3.8.4 |
| |
Table 4. SPARK TESTING - segment
10.3.8.5 |
| |
Table 5. SEAM SPECIMEN TEST
SPECIFICATIONS - segment 10.3.9.7 |
| APPENDICES |
| |
APPENDIX A - MANUFACTURER/INSTALLER COMPLIANCE
AGREEMENT |
| |
APPENDIX B - CHECKLIST OF ITEMS REQUIRED PRIOR
TO FIELD DEPLOYMENT OF GEOSYNTHETICS |